
When I left Easton I knew it was snowing here and I had an easy job of replacing about eight feet of wall and a vanity. With a 1025 mile commute, each way.

When I got there, and the mold abatement guys had gotten done, I found almost forty linear feet of wall stripped to the studs in two bathrooms and the master bedroom. The walls, vanity, and flooring had to be replaced. So much for a three day job, followed by a little relaxing in the sun.


The replacement bath turned out sharp.

While I was doing the flood repair, my wife and children helped the homeowners repaint parts of the house that had been unaffected by water damage, but suffered from beigeitis.